Jump to content

San Diego Trolley

Route map:
From Wikipedia, the free encyclopedia

San Diego Trolley
A Green Line trolley at Convention Center station
Overview
OwnerSan Diego Metropolitan Transit System
LocaleSan Diego County, California, United States
Transit typeLight rail
Number of lines4, plus 1 limited service heritage streetcar line[1][2]
Number of stations62[1]
Daily ridership129,800 (weekdays, Q3 2024)[3]
Annual ridership38,438,000 (2023)[4]
HeadquartersJames R. Mills Building
1255 Imperial Avenue
San Diego, California
WebsiteSan Diego Trolley
Operation
Began operationJuly 26, 1981; 43 years ago (1981-07-26)[2]
Operator(s)San Diego Trolley, Inc.
Number of vehicles
Technical
System length65 mi (105 km)[1]
No. of tracks2 tracks[note 1]
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line600 V DC[5]
Top speed55 mph (89 km/h)[5]
System map
Map
Santee
Gillespie Field
Arnele Avenue
El Cajon
Amaya Drive
Grossmont
70th Street
UC San Diego Health East
SDSU
UTC
Grantville
Executive Drive
Mission San Diego
UC San Diego Health La Jolla
Stadium
UC San Diego Central Campus
Fenton Parkway
VA Medical Center
Rio Vista
Nobel Drive
Mission Valley Center
Balboa Avenue
Hazard Center
Clairemont Drive
Fashion Valley
Tecolote Road
Morena/Linda Vista
La Mesa Blvd.
Amtrak San Diego International Airport (via Old Town Transit Center)
Old Town
Spring Street
Washington Street
Lemon Grove Depot
San Diego International Airport (via Middletown station (San Diego Trolley))
Middletown
Massachusetts Avenue
County Center/Little Italy
Encanto/62nd Street
Amtrak San Diego International Airport (via Santa Fe Depot (San Diego))
Santa Fe Depot
Euclid Avenue
47th Street
San Diego International Airport (via America Plaza station)
America Plaza
32nd & Commercial
closed
1991
Columbia Street
25th & Commercial
Courthouse
Civic Center
Fifth Avenue
closed
1986
San Diego Square
San Diego International Airport (via City College station (San Diego))
City College
Park & Market
Seaport Village
Convention Center
Gaslamp Quarter
12th & Imperial
Storage &
Maintenance Yard
Barrio Logan
Harborside
Pacific Fleet
8th Street
24th Street
E Street
H Street
Palomar Street
Palm Avenue
Iris Avenue
Beyer Blvd.
San Ysidro
Key
Blue Line
Orange Line
Green Line
Copper Line
Multiple services

Handicapped/disabled access All stations are accessible

The San Diego Trolley is a light rail system serving San Diego County, California. The trolley's operator, San Diego Trolley, Inc. (reporting mark SDTI), is a subsidiary of the San Diego Metropolitan Transit System (MTS). The trolley operates as a critical component of MTS, with connections to and integrated travel tickets with the local bus systems.

The trolley system serves 62 stations, over about 67.9 miles (109.3 km) of route, using four primary lines (Blue, Orange, Green, and Copper) that operate daily, and a "downtown loop" heritage streetcar line (Silver) that operates on holidays. There is one downtown station where all the lines connect, and 13 other stations that provide transfers to a second line (two of these also provide connections to commuter rail systems).

The trolley began service on July 26, 1981, making it the oldest of the second-generation light rail systems in the United States, and the success of the system helped spark a nationwide revival of light rail. In 2023, the trolley had the highest ridership of any light rail system in the United States, with 38,047,300 annual rides, or about 129,800 per weekday as of the third quarter of 2024.

History

[edit]

2023 was the 42nd anniversary of the San Diego Trolley, and MTS prepared a brief historical review of San Diego trolleys, and in particular the San Diego Trolley. MTS also has a more extensive slideshow and timeline available. The last day of streetcar operation in San Diego was April 23, 1949. On July 19, 1981 electric railcars returned to San Diego streets on the first modern American light rail system integrated with its bus system.

Early history

[edit]

Electric rail service in San Diego traces its roots back to 1891 when John D. Spreckels incorporated the San Diego Electric Railway.[6] San Diego's streetcar system had been replaced with buses in 1949, and by 1966 the local bus company, San Diego Transit, was facing a financial crisis and public takeover.

Planning for mass transit in the San Diego region began in 1966 under the auspices of the Comprehensive Planning Organization (CPO, now known as the San Diego Association of Governments, SANDAG), an intergovernmental agency of 13 cities and San Diego County.[7]

Over the next decade, the CPO researched various technologies including improvements to local buses, express buses, heavy rail, light rail, and advanced technologies. The CPO also closely studied the San Francisco Bay Area Rapid Transit (BART) system, then under construction. Ultimately, the early studies went nowhere due to disagreements between stakeholders and a lack of funding.

In 1975, the CPO published the Regional Transportation Plan which included a 58-mile (93 km) intermediate capacity fixed guideway system (an untested technology at the time) at a cost of $1.5 billion.[8]

Metropolitan Transit Development Board

[edit]

In the early 1970s, three state legislative acts would set the stage for the construction of mass transit in the San Diego region.

The Transportation Development Act, signed by Governor Ronald Reagan in 1971, earmarked 25% of the state sales tax for funding transportation projects, including mass transit. A 1974 amendment to Article 19 of the Constitution of California permitted the use of gas tax revenues, previously reserved for highway construction, for construction of rail systems. Finally, a 1975 law established the San Diego Metropolitan Transit Development Board (MTDB) with a clear mission: design, construct and operate a guideway transit system.[8] The entire process was assigned to MTDB to assure accountability.[8] The legislation was written and supported by State Senator James R. Mills, the President Pro Tem during this period and a strong transit advocate.[9]

The MTDB formally started operations on January 1, 1976. The MTDB's enabling legislation and principles adopted by the Board required the planning give added weight to systems that satisfy a number of criteria: priority consideration for technologies available and in use, a system that is capable of being brought into operation incrementally, and using rights-of-way owned by public entities to minimize construction costs.[8]

In December 1976, the MTDB launched its 18-month Guideway Planning Project to be held in two phases. Phase 1 involved the evaluation of potential corridors based on the CPO's 1975 Regional Transportation Plan and was guided by principles set by the MTDB board: the corridor should extend a long-distance and offer high-speed operation, the system should be at grade in a mostly exclusive right-of-way, capital costs should be low, and operating deficits should be minimized. Phase 1 studied over 100 miles of potential corridors with 45 miles of corridor recommended for further evaluation in Phase 2. At about the same time, a working paper presented an evaluation of four guideway technologies: light rail, two categories of heavy rail, and Automated Small Vehicle Transit.[8]

In August 1977, the MTDB board selected the South Bay region for the detailed Phase 2 study. There would be several potential corridors to consider, including along freeways (Interstate highways I-5, I-8 & I-805 and State Routes 94 & 16), along existing railroad rights-of-way, and arterial roads.

In October 1977 the board selected light rail as the lone guideway transit technology to be studied (it would also be compared to several all-bus alternatives). In making the decision to pursue light rail, the MTBD board said it best followed the principles it laid out as light rail can offer high-speed travel, the right-of-way is flexible, and construction costs can be low when at-grade construction is maximized.[8] The technology was new for the United States, but was well established in Germany.

Hurricane Kathleen

[edit]

On September 10, 1976, nature intervened, setting off a chain of events that would help decide the corridor to be used.

Hurricane Kathleen destroyed parts of San Diego and Arizona Eastern Railway (SD&AE) Desert Line (east of San Diego), which at the time was owned by Southern Pacific (SP) railroad.[7] The SD&AE offered freight service with a line that traveled between downtown San Diego, San Ysidro, northern Baja California (in Mexico), and Imperial County before connecting with the rest of the SP system in Plaster City, California. The hurricane caused $1.3 million worth of damage to the line ($6.96 million adjusted for inflation), primarily in Imperial County, east of San Diego.[8] Freight service was suspended, and in light of the extensive damages, SP petitioned the Interstate Commerce Commission to abandon the SD&AE on August 9, 1977.

The MTDB immediately began studying the SD&AE corridor between downtown San Diego and the San Ysidro Port of Entry for joint use by electric light rail and freight trains. In June 1978, the MTDB found the entire joint-use project feasible.[8]

At the same time, the San Diego County Board of Supervisors became concerned about the potential loss of freight service on the SD&AE, which was seen as vital to the county's economic interests and the continued viability of San Diego as a deep-water port. The county commissioned its own study to examine using a portion of the SD&AE tracks for passenger service which would share the track with freight services, the motivation being the transit services could share the costs of maintaining the tracks. San Diego County proposed operating either commuter rail trains or self-powered diesel rail cars.

Initial implementation

[edit]
Diagram of the South Line as originally opened in 1981

In 1978, the Interstate Commerce Commission denied the request to abandon the SD&AE, prompting Southern Pacific to offer the railroad for sale to anyone willing to maintain freight operations on the line. The MTDB stepped in and offered to buy the SD&AE for $18.1 million if the Southern Pacific fully repaired the hurricane-damaged line. The deal closed on August 20, 1979, with the final acquisition occurring on November 1, 1979.[10][8] The MTDB quickly secured a deal with the San Diego and Imperial Valley Railroad to continue freight service along the line.

The purchase gave MTDB ownership of two sections of right-of-way that could be used for mass transit: the SD&AE Main Line from downtown San Diego to San Ysidro, and the SD&AE La Mesa Branch from downtown San Diego to El Cajon.

With all the planning in place, construction of the 15.9-mile (25.6 km) "South Line" transit corridor (the southern portion of today's Blue Line) was able to begin just one month after acquisition in December 1979 and would be accomplished in two phases.[8]

The first phase of the project cost $86 million, which included the purchase of the SD&AE, 14 light rail vehicles, construction of a single-tracked electrified light rail line along the 14.2-mile (22.9 km) SD&AE Main Line and construction of a 1.7-mile (2.7 km) section of new street running tracks in downtown San Diego.[8] To control costs, only minor rehabilitation was conducted on the SD&AE corridor, with the MTDB replacing about 40% of the ties, welding the jointed rail, constructing electric catenaries, and installing an absolute block signal system.

Funding for the project came entirely from Transportation Development Act state sales tax and local gas tax revenues. Federal funds were not actively sought due to the locally perceived notion that San Diego would not qualify due to low population densities, uncongested highways, and undefined corridors.[8]

San Diego Trolley in 1982, about six months after opening

In August 1980, the MTDB established San Diego Trolley, Inc. to operate and maintain the new light rail system and on July 26, 1981, service began. Trains operated every 20 minutes (timed to meet at four passing tracks on the single track sections) between 5 am and 9 pm and carried approximately 10,000 passengers a day.[6]

In light of the strong ridership, construction of the second phase was started almost immediately, which involved double-tracking the SD&AE corridor and purchasing 10 additional vehicles. Upon completion of double-tracking in February 1983, the total cost of the project was $116.6 million.[8]

The success of the San Diego Trolley would also spark a nationwide revival of light rail in the late 1980s, with lines built in several other mid-sized cities (Buffalo, Denver, Portland, Sacramento and San Jose).[11]

Early expansions

[edit]
Construction of the Little Italy extension in October 1991

The San Diego Trolley added a second line on March 23, 1986, that shared the same downtown tracks and traveled east to Euclid Avenue on the La Mesa Branch of the SD&AE. The new route was then called the Euclid Line (part of today's Orange Line).[6][7] This line was extended to El Cajon by June 23, 1989, at which time it was renamed the East Line.[6] Service was expanded beyond the old SD&AE right-of-way when the line was extended further, north, to Santee on August 26, 1995.[6][7]

The East Line's Bayside Connection extension to the San Diego Convention Center and Gaslamp Quarter opened on June 30, 1990.[12] Later in the decade, the South Line was extended to the north, reaching Little Italy on July 2, 1992,[12] and Old Town on June 16, 1996.[7][12]

The system was further expanded east from the Old Town station as the Mission Valley Line, which opened on November 23, 1997. It proceeded eastward from Old Town to Fashion Valley Mall, Mission Valley Mall, and San Diego Stadium. At the same time, the South Line (which now traveled north of downtown San Diego to Old Town) and East Line of the system were renamed the Blue Line and the Orange Line, respectively.[6][7][12]

The Mission Valley East extension, which opened on July 10, 2005, built the only underground station in the system at San Diego State University, as well as its highest elevated station at Grantville. This line was then renamed the Green Line.[12] The line also featured the first low-floor trolley vehicles, that allow passengers to board without climbing stairs and allowed passengers using wheelchairs to use a small bridge plate instead of the slower lifts on the older trains. But, the new vehicles could only operate on the Green Line, forcing passengers heading between Mission Valley and downtown San Diego to change trains in Old Town. (This restriction no longer applies.)

Trolley Renewal Project

[edit]
A low-floor trolley operating on the Blue Line at Fifth Avenue station, rebuilt as part of the Trolley Renewal Project.

In the late 2000s, as parts of the San Diego Trolley approached 30 years old, the system was in need of an overhaul of its oldest facilities. Also, after the success of the low-floor trolley cars on the Green Line, MTS wanted to operate similar vehicles on all lines.[13]

Officials secured $660 million in funding after the 2008 election as voters passed the TransNet half-cent local sales tax and two statewide transportation bond measures. The project also received funding from the American Recovery and Reinvestment Act and federal formula funds.[14]

The "Trolley Renewal Project" would entail several improvements. Each station would get larger shelters to provide more protection from sun and rain, new benches, and digital "next arrival" signs. Worn-out infrastructure was replaced as needed, including rails, ties, catenary wires, power lines and electrical substations.[13] The project also included a new signalling system that would allow two freight trains to operate at night, rather than one.[14]

To enable the switch to a low-floor light rail vehicle (LRV) fleet, platforms at 35 stations would need to be raised from either ground level or sidewalk level (4-inch (102 mm)) to 6-inch (152 mm). Stations also needed a new "safety edge tile" with a smooth surface in the center to allow wheelchair ramps to deploy (the existing safety tile would stop ramps from fully deploying). The other complication of the switch to low-floor LRVs was that the traditional Siemens S70, like those ordered for the Green Line, were over 90 feet (27 m) long, so a three-car train would not fit within downtown San Diego's 240 feet (73 m) blocks.[13] MTS teamed up with the Utah Transit Authority, which faced a similar problem with its system. The solution for both agencies was a specialized design Siemens called the S70 US ("Ultra Short") which retains the low-floor design, but would be the same length as the older high-floor vehicles (80 feet (24 m)).[14]

MTS and SANDAG agreed to purchase a total of 65 vehicles, which would arrive between September 2011 and January 27, 2015.[13][15] However, there was not enough funding to replace all 123 high-floor cars at once. The decision was made to retire the original Siemens-Duewag U2 LRVs, and operate three-car trains with the new low-floor LRVs in the front and back, and an older high-floor Siemens SD-100 car in the middle.

In late 2010, work to rebuild the stations started at Old Town Transit Center and worked south.[16][17] By September 2, 2012, work was completed on the Old Town and Bayshore lines, allowing for a realignment of service.[18][19] The Green Line was extended from its former western terminus in Old Town south to 12th & Imperial Transit Center's Bayside Terminal platform, while the Orange Line was truncated to Santa Fe Depot and the Blue Line to America Plaza.[20] The new alignment meant all lines now passed through downtown and created a universal transfer point for all lines at 12th & Imperial Transit Center.

By January 9, 2013, all stations on the Orange Line had been rebuilt, allowing low-floor LRVs to begin service on a second line.[21] Rebuilding of the remaining stations (all on the Blue Line) was completed by January 27, 2015,[22] The project, including remaining station and track renovations, was completed in late 2015.[23]

Mid-Coast Trolley extension project

[edit]

In 2011, SANDAG received key approval for the Mid-coast extension of the Blue Line,[24] running from Old Town Transit Center 11 miles (17.7 km) north to the University City community, serving major activity and employment centers such as Mission Bay Park, the University of California, San Diego (UC San Diego) campus, three major hospitals on (and adjacent to) the campus, and Westfield UTC mall.[25][26][27] Construction began in October 2016,[28] and train testing on the line began in late June 2021.[29] The Mid-Coast extension opened on November 21, 2021.[30]

The Blue Line was re-extended north from its original northern terminus at America Plaza to run through five existing stations (up to and including its pre-2012 terminus, the Old Town Transit Center), and continuing to nine new trolley stations: Tecolote Road, Clairemont Drive, Balboa Avenue, Nobel Drive, VA Medical Center, UCSD West/Pepper Canyon, UCSD East/Voigt Drive, Executive Drive, and UTC. The northern terminal station, UTC, is part of the UTC Transit Center, at Westfield UTC in the University City/UC San Diego area.[25]

Copper Line

[edit]

In early 2024, MTS proposed truncating the eastern terminus of both the Green and Orange lines to El Cajon Transit Center, replacing the easternmost sections of both lines with a Copper Line between El Cajon and Santee station.[31][32] The Copper Line was scheduled begin operations on September 29, 2024.[31] The line would later begin operating that day.[33]

Current service

[edit]

Lines

[edit]

As of 2024, trolley service operates on four daily lines: the Blue, Green, Orange, and Copper lines, and traveling through 65 total miles of mostly double-track rail and serving 62 stations.[1] A fifth line, the heritage streetcar Silver Line, operates more limited weekday and weekend service, in a clockwise 'circle-loop' around downtown San Diego only (this is an overlay of existing parts of other lines in downtown).[34]

Current Trolley System as of 2024

Stations

[edit]

The San Diego Trolley system has 62 operational stations serving its three major Trolley lines (Blue, Green, and Orange), as well as the Copper Line shuttle and limited-service Silver Line.[36]

Thirteen of the trolley system's stations operate as transfer stations, which allow passengers to transfer between lines. 12th & Imperial Transit Center allows for transferring between the Blue, Green, and Orange lines, serving as a universal transfer point for most riders in the system. The adjacent Santa Fe Depot/America Plaza/Courthouse stations, which are within walking distance of each other, also allow for transfer among the three major lines. Since the opening of the Copper Line, riders bound for Arnele Avenue, Gillespie Field, or Santee must transfer at El Cajon Transit Center. Six trolley stations are end-of-line stations: 12th & Imperial Transit Center, Courthouse, El Cajon Transit Center, Santee, San Ysidro Transit Center, and UTC Transit Center. Thirty-seven stations are within the city limits of San Diego, serving various neighborhoods in San Diego; the other stations are located in the cities of Chula Vista, El Cajon, La Mesa, Lemon Grove, National City, and Santee.

Most of the stations in the San Diego Trolley system are 'at-grade' stations. There are 10 aerial stations, mostly on the Blue Line, with some on the Green Line. For the Blue Line, these are Nobel Drive, VA Medical Center, UC San Diego Central Campus, UC San Diego Health La Jolla, Executive Drive, and UTC Transit Center. For the Green Line, these are Fashion Valley Transit Center, Stadium, Mission San Diego, and Grantville. There is just one trolley station in the system that is underground – SDSU Transit Center – also on the Green Line.

About half of San Diego Trolley stations offer free park and ride lots.[37] Most trolley stations offer connections to MTS bus lines.

Hours of operation

[edit]

The San Diego Trolley's four main lines operate regular service between 5 am and 11:30 pm, seven days a week. Limited service on particular segments is provided before 5 am and after 11:30 pm. There is no rail service between 2 am and 4 am.[38] During these hours when there is no passenger service, freight trains of the San Diego and Imperial Valley Railroad operate on the trolley's right of way.

Generally, trains operate every 15 minutes, seven days a week, with less frequent service during early morning and late evening hours.[38] Additional service on the Blue Line between America Plaza and San Ysidro boosts frequency to every 7.5 minutes during weekdays.

Fares and fare collection

[edit]

The San Diego Trolley operates on a proof-of-payment system. Passengers must have proof of fare (ticket or pass) before boarding. Self-serve ticket-vending machines located at each station sell one-way paper tickets and passes (one day and monthly) on the Pronto Card. (An older fare card that was used was the Compass Card.)

Roving transit enforcement personnel conduct random ticket inspections throughout the system. If customers are caught without a valid fare, they may be fined. Based on frequent security inspections, nearly 98% of the 37 million patrons have proper fares.[2]

One-way fares are good for up to two hours from the time of purchase. The fare does include a transfer to other routes, as long as it is within two hours from the time of purchase.[39]

One-day and monthly passes are sold on the Pronto Card. The card itself costs $2, and fares are loaded on to it as needed for the different transit systems within San Diego County (including the San Diego Trolley, MTS Bus, MTS Rapid buses, NCTD Breeze buses, and the NCTD Sprinter (a light rail line in North San Diego County). More expensive premium passes include access to the NCTD Coaster commuter rail service, MTS Rapid Express, and MTS Rural buses.

Pronto cards are linked to an account which can store value to be used at any time. The Pronto card uses the "best fare," which is similar to pay-as-you-go. The card will automatically deduct a one-way fare each time it is tapped, and will cap the total fare deducted in a day to the limit of a Day Pass, which is $6. Pronto will also cap the total monthly fare to the same price as a Month Pass, which is $72.

The Pronto card must be tapped on a Pronto Card validator (located just outside the paid area of stations), or the QR code must be scanned from within the Pronto App when entering and transferring within the system in order to be validated.

Ridership

[edit]

As of the Fourth Quarter (Q4) of 2013, the average weekday ridership on the San Diego Trolley system was 119,800,[41] making it the fourth busiest Light rail system in the United States. Taking overall track length into consideration, the San Diego Trolley transported 2,239 daily passengers per route mile in Q4 2014, making it the twelfth busiest Light rail system on a per mile basis over this time period. Weekday ridership on the trolley has been relatively high since Q3 2013 (see table at right).

In all of 2014, the San Diego Trolley provided 39,731,900 unlinked passenger transits according to the American Public Transportation Association (APTA).[41] MTS reported that there were 39,694,197 trips on the trolley in Fiscal Year 2014 (FY 2014), a 34% increase over Fiscal Year 2013.[42] Of the trolley's three lines, the Blue Line has the system's highest ridership with 15,094,878 riders during FY 2014, followed by the Green Line with 13,673,926 FY 2014 riders, and the Orange Line with 10,896,289 FY 2014 riders.[42] The Silver Line, operating only mid-days just four days a week (and with some service interruptions during the year), carried 29,104 passengers around the downtown loop in FY2014.

According to figures from APTA, previous to 2014, the San Diego Trolley achieved the highest level of ridership in 2007, when there were 36,386,100 unlinked passenger transits on the system over that entire year.[44] The trolley system's highest average weekday ridership of 124,300 was achieved in Q3 2007[51] – this corresponded to 2,323 passengers per route mile daily.

Proposed extensions

[edit]

Proposed Balboa Park streetcar line

[edit]

MTS began work in March 2011 on a study to evaluate the feasibility of reconnecting Balboa Park, the San Diego Zoo and downtown San Diego through a fixed-guideway, electrified streetcar line – the final study on the subject was published in October 2012.[52] The project study corridor runs between the City College Trolley Station area, and Balboa Park in the vicinity of the San Diego Zoo.[53] An alignment similar to the proposed one was last served by a streetcar system in 1949 on lines 7 (Park Boulevard-University Avenue to East San Diego) & 11 (Park Boulevard-Adams Avenue to Kensington).[54] The Committee evaluated what types of streetcars to use for this proposed line, the possible options including the recently ordered 57 Ultra Short 2011 S70s in the "Modern Streetcar" category, and the restored PCC Streetcars from the downtown Silver Line in the "Vintage Streetcar" category.[55][56] The major construction issues were how to cross I-5 without having to reconstruct the entire bridge, and how to make the construction strong enough to support the full weight of heavier light rail trains (for possible line extension). No low-cost solution to this problem was identified. The estimated cost for construction of this line was $68.2 million, with each trolley car estimated to cost between $850,000 (for a restored PCC trolley car) to $3.6 million (for a modern trolley car). Four cars are anticipated for service on this line. No funding sources were identified. No further action on this proposal has taken place since the October 2012 release of the study.

Proposed airport extension

[edit]

One of the biggest gaps in the San Diego Trolley system is the lack of a connection to San Diego International Airport.[57] MTS says the extension presents engineering challenges and would be costly, but the agency's polls and outreach show the extension is one of the most desired projects among the public. Over the years there have been several proposals, with the most serious coming as part of the proposed "Elevate SD 2020" transit tax. That project would have created a new line that connected the airport to both the 12th & Imperial Transit Center and the Old Town Transit Center with a wye spur between the Middletown and Little Italy stations.[58] In April 2020, MTS decided not to pursue the transit tax ballot initiative.[59] However, an extension of the trolley to the airport is included as an alternative proposal as part of SANDAG's Central Mobility Hub project for the airport, which is in the Draft Environmental Impact Report phase as of 2021.[60][61]

Connecting service between the trolley and the airport is provided by local bus Route 992 that serves the Santa Fe Depot/America Plaza transit area. Additionally, the airport runs two shuttles: one that stops at the Old Town station (called the San Diego Flyer), and another that stops a block from the Middletown station (the rental car shuttle). Both have stops at both terminals.[62]

Current proposals for transit to the airport involve building a new people mover line called the Airport Transit Connection.[63][64][65]

Airport Transit Connection
Airport Transit Connection (ATC)
Concept 1
Green and Blue Lines
Rental Car Center
Green and Blue Lines
Harbor Island (optional)
SDIA
Concept 2
Green and Blue Lines
Old Town Transit Center
Rental Car Center
Port Transit Center
Green and Blue Lines
Harbor Island (optional)
SDIA
Concept 3
Green and Blue Lines
Rental Car Center
Port Transit Center
Green and Blue Lines
Harbor Island (optional)
SDIA
Concept 4
Green and Blue Lines
Rental Car Center
Port Transit Center
Green and Blue Lines
Harbor Island (optional)
SDIA
County Administrative Building (optional)
Green and Blue Lines
Santa Fe Depot
Blue Line
Convention Center
Green Line
Concept 5
Green and Blue Lines
Rental Car Center
Port Transit Center
Green and Blue Lines
Harbor Island (optional)
SDIA
County Administrative Building (optional)
Green and Blue Lines
Santa Fe Depot
Green Line
Civic/Core
Blue and Orange Lines

Handicapped/disabled access All stations are accessible
Source[66]

Proposed Purple Line

[edit]

The Purple Line is a proposed San Diego Trolley line that would run from San Ysidro Transit Center at the United States–Mexico border to Kearny Mesa with a possible extension to Carmel Valley. It would run along, or close to I-805 and I-15.

In April 2011, the San Diego Association of Governments (SANDAG) released a draft of its 2050 Regional Transportation Plan, which was approved by the SANDAG Board of Directors on October 28, 2011. An inland trolley line from San Ysidro to Kearny Mesa, though not yet called the Purple Line, was included in the plan.[67][68][69]

In 2016, SANDAG had a measure on the ballot to fund development of the Purple Line. It failed to pass.[70]

In April 2019, MTS again included the Purple Line in a final version of a November ballot initiative to increase the countywide sales tax by a half-cent to fund future transit plans.[71] In April 2020, MTS decided not to pursue the transit tax ballot initiative.[59]

Cross-Border Trolley and other project at San Ysidro

[edit]

Although the current Blue Line ends at San Ysidro Transit Center, just north of the Mexico–United States border, future plans for the Blue Line to continue into Tijuana are awaiting approval. If it is to be made, the Blue Line would be extended 1 mile[72] or 1.5 miles[73] on an elevated trackage[74] into a new Tijuana station.[75] This proposal for a "Cross-Border Trolley", supported by SANDAG[76] and officials in Baja California,[77] could take 8 years to complete.[78]

Other projects

[edit]

MTS has proposed the establishment of an "Owl" express bus operating on the southern section of the Blue Line from midnight to 4 A.M., when the Blue Line isn't running. This Owl bus, which will operate between downtown San Diego and San Ysidro Transit Center, is "potentially scheduled" to begin operations in 2025.[79]

Additionally, the 2021 SANDAG regional plan contains proposals for additional rail lines to be implemented by 2050. These include a tram line (known simply as "Tram 555") from downtown to Hillcrest via Logan Heights; Commuter Rail 581 and 581B, connecting El Cajon to downtown and the Central Mobility Hub (a proposed transit center at San Diego International Airport), respectively; and Commuter Rail 583, which will connect the Central Mobility Hub with San Ysidro.[80][81]

Tram 555 Commuter Rail
Tram 555
 581 
El Cajon Blvd.
and Park Blvd.
El Cajon Blvd.
and 30th St.
30th St. and
Polk Ave.
Park Blvd.
and University Ave.
30th St. and
University Ave.
Park and Sixth Ave.
Fifth Avenue
Blue and
Orange Lines
Blue and
Orange Lines
Park & Market
Blue and
Orange Lines

Handicapped/disabled access All stations are accessible
Station names unofficial
Source[82]
Commuter Rail 581
El Cajon  581/581B 
La Mesa Boulevard
Green Line to El Cajon T.C.
SDSU
Green Line to 12th & Imperial
El Cajon Bl & I-15 Transit Plaza San Diego MTS bus system Rapid (San Diego)
I-805
Tram 555 to Downtown
 555 
 555 
Tram 555 to Downtown
Central Mobility Hub  581B  San Diego International Airport People mover
Downtown  581 

Handicapped/disabled access All stations are accessible
Source[83]
Commuter Rail 583
Central Mobility Hub  581B  San Diego International Airport People mover
Coaster, Blue
and Green Lines
Santa Fe Depot
City College
San Diego International Airport (via City College station (San Diego))
12th & Imperial
Blue and Orange Lines
Purple Line to Mira Mesa
E Street/4th Avenue
Orange Avenue/4th Avenue
Iris Avenue
San Ysidro
Greyhound Lines
Cross Border Xpress

Handicapped/disabled access All stations are accessible
(exact stations not finalized)
Sources[84][85]

Fleet

[edit]
San Diego Trolley interior

The San Diego Trolley operates on all its main lines with an all-Siemens fleet of light-rail vehicles (LRVs). It also runs 2 "heritage" PCC street cars on the Silver Line, a downtown-only circuit on a select schedule.

When the system opened in 1981, the agency purchased a fleet of 71 high-floor Siemens–Duewag U2 vehicles, originally designed for and used by the Frankfurt U-Bahn. At the time, no purpose-built LRVs were being manufactured for the North American market, so the model was adapted for use by San Diego and other transit systems in Canada. The vehicles were built in West Germany, with some assistance from a Siemens facility in Florin, California, a suburb of Sacramento. These cars were withdrawn from service between 2010 and 2015. Eleven of the U2 cars were sold to the new Metrotranvía Mendoza in Mendoza, Argentina, in 2010,[86] 29 were retired after the Orange Line was converted in early 2013,[2] and the rest were retired after the Blue Line was converted in January 2015.[87] Six U2 cars have been preserved: car 1001 was retained by MTS for use on the Silver Line,[88] cars 1003 and 1008 were donated to the Southern California Railway Museum,[89] cars 1017 and 1018 were donated to the Western Railway Museum,[90] and car 1019 was donated to the Rockhill Trolley Museum.[91] Car 1035 was sold in late 2020 to the Memphis Area Transit Authority, which operates a vintage-trolley system and intends to use the LRV for testing of modern, higher-capacity vehicles on its Madison Avenue Line.[92][93]

In 1995, the San Diego Trolley purchased a fleet of 52 high-floor Siemens SD-100 vehicles, an evolution of the U2, but redesigned for the North American market. Starting with this order, all of San Diego's future LRVs would be built in California at the Florin factory. The SD-100s have since been retired from service since 2023.

Starting in 2005, San Diego started shifting to a low-floor fleet. The design of the Siemens S70 vehicles required that stations be designed with slightly higher platforms, so the 11 car fleet could only operate on the newly constructed Green Line.[12] The other limitation of the S70 fleet was that they were about 9.34 feet (2.85 m) longer than the SD-100 vehicles, which would make three-car trains longer than a single block in downtown San Diego.[15]

In 2009, San Diego ordered a fleet of 65 specialized Siemens S70 US ("Ultra Short") vehicles, which retain the low-floor design but would be the same length as the SD-100 vehicles.

In 2016, San Diego ordered an additional 45 specialized LRVs, this time the Siemens S700 US, which has a redesigned center section, with longitudinal seating (passengers facing the aisle) instead of the S70's more traditional seating with passengers sitting four-across, facing forward or back, with an aisle in between. This change, was made to eliminate a seating layout that had been criticized as cramped and ease the movement of passengers within that section.[94][95] The San Diego Trolley ordered an additional 25 S700 US vehicles in 2019; these vehicles were delivered by the end of 2021.[96]

Specifications

[edit]

Below are the technical specifications of the system's three primary series of light rail vehicles:[5][100]

See also

[edit]

Notes

[edit]
  1. ^ There is a single track section of the Copper Line at its northern terminus.

References

[edit]
  1. ^ a b c d "About MTS". 2021. Archived from the original on March 15, 2022. Retrieved November 29, 2021. Light rail service is operated by SDTI on four lines (the UC San Diego Blue, Orange, Green and Silver Lines) with a total of 62 stations and 65 miles of rail.
  2. ^ a b c d e f g "San Diego Trolley, Inc. Fact Sheet" (PDF). San Diego Metropolitan Transit System. February 2013. Archived (PDF) from the original on September 10, 2020. Retrieved April 14, 2021 – via sdmts.com/about-mts.
  3. ^ "Transit Ridership Report Third Quarter 2024" (PDF). American Public Transportation Association. November 20, 2024. Retrieved November 23, 2024.
  4. ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
  5. ^ a b c d e "San Diego Trolley Light Rail Vehicles" (PDF). San Diego Metropolitan Transit System. February 2015. Archived (PDF) from the original on December 22, 2015. Retrieved December 11, 2015 – via sdmts.com/about-mts.
  6. ^ a b c d e f "MTS Historical Timeline". San Diego Metropolitan Transit System. 2013. Archived from the original on August 20, 2013. Retrieved April 12, 2021.
  7. ^ a b c d e f Copeland, P. Allen (2002). California trolleys in color. Scotch Plains, NJ: Morning Sun Books. p. 27. ISBN 1-58248-076-1. OCLC 52471706. Archived from the original on February 27, 2024. Retrieved April 14, 2021.
  8. ^ a b c d e f g h i j k l m Euritt, Mark A.; Hoffman, M. Allen; Walton, C. Michael (August 1994). The Decision Process for Implementing Fixed-Guideway Systems (PDF) (Report). The University of Texas at Austin. Archived (PDF) from the original on March 21, 2023. Retrieved April 12, 2021.
  9. ^ Wilkens, John (April 3, 2021). "James Mills, state legislator who championed public transit, historic preservation, dies at 93". The San Diego Union-Tribune. Archived from the original on April 4, 2021. Retrieved April 4, 2021.
  10. ^ Gargrove, Dorian (September 10, 2014). "Crazy Train". San Diego Reader. Archived from the original on April 11, 2018. Retrieved April 10, 2018.
  11. ^ Minister, R. David; Clarke, David J. (March 30, 1982). "Factors to Consider in Designing a Joint Bus-Light Rail Transit Mall" (PDF). Transportation Research Board.
  12. ^ a b c d e f Ristine, Jeff (July 23, 2006). "After 25 years, the trolley keeps on moving". The San Diego Union-Tribune. Archived from the original on May 15, 2007. Retrieved June 14, 2009.
  13. ^ a b c d "San Diego Trolley Renewal Project Fact Sheet" (PDF). San Diego Association of Governments. September 2015. Archived (PDF) from the original on January 23, 2021. Retrieved April 14, 2021.
  14. ^ a b c Cotey, Angela (April 2012). "San Diego Metropolitan Transit System's trolley renewal project". Progressive Railroading. Archived from the original on April 14, 2021. Retrieved April 14, 2021.
  15. ^ a b Cook, Morgan (August 24, 2015). "Trolley posteriors raise downtown ire". The San Diego Union-Tribune. Archived from the original on April 12, 2021. Retrieved April 12, 2021.
  16. ^ Robert J. Hawkins (September 22, 2010). "Construction Begins To Upgrade SD Trolley - $620M Project To Include New Track, Stations Along Blue, Orange Lines". KGTV ABC10 San Diego. Archived from the original on April 5, 2016. Retrieved March 23, 2016.
  17. ^ "Several Blue Line trolley stops to close this weekend". The San Diego Union Tribune. October 27, 2010. Archived from the original on April 7, 2016. Retrieved March 23, 2016.
  18. ^ "Green Line Will Finally Arrive Downtown". KPBS. April 30, 2012. Archived from the original on September 26, 2013. Retrieved May 1, 2012.
  19. ^ "SDMTS Service Changes, September 2012". San Diego Metropolitan Transit System. September 2, 2012. Archived from the original on April 30, 2015. Retrieved October 22, 2012.
  20. ^ "SDMTS Summer 2010 Newsletter" (PDF). San Diego Metropolitan Transit System. June 2010. Archived from the original (PDF) on March 19, 2015. Retrieved October 22, 2012.
  21. ^ "Trolley Renewal Breakthrough: New Low-Floor Trolleys Now Operate on the Orange Line!" (Press release). September 24, 2015. Archived from the original on May 25, 2017. Retrieved April 14, 2021.
  22. ^ "Blue Line Upgraded with a New Fleet of Low-Floor Trolley Cars". San Diego Metropolitan Transit System. January 27, 2015. Archived from the original on March 15, 2016. Retrieved April 17, 2016.
  23. ^ "Trolley Renewal". San Diego Metropolitan Transit System. 2015. Archived from the original on March 22, 2016. Retrieved April 17, 2016 – via sdmts.com/inside-mts/current-projects.
  24. ^ "Mid-Coast Trolley gets key federal approval". U-T San Diego. September 16, 2011. Archived from the original on October 20, 2011. Retrieved September 17, 2011.
  25. ^ a b "Mid-Coast Corridor Transit Project". SANDAG. Archived from the original on May 15, 2018. Retrieved April 17, 2016.
  26. ^ "Light Rail Transit Project". University of California, San Diego. Archived from the original on August 11, 2011. Retrieved September 15, 2011 – via blink.ucsd.edu/.
  27. ^ "Mid-Coast Corridor Transit Project Fact Sheet" (PDF). SANDAG. February 2015. Archived (PDF) from the original on September 24, 2015. Retrieved December 11, 2015.
  28. ^ Stafford, Audra (March 29, 2019). "$2.17B Mid-Coast Trolley Project Reaches Milestone: It's Halfway Finished". NBC 7 San Diego. Archived from the original on August 29, 2019. Retrieved August 28, 2019.
  29. ^ Stafford, Audra; Rendon-Alvarez, Karla (June 29, 2021). "MTS, SANDAG Celebrate First Test Run of Mid Coast Trolley Project's New Tracks". NBC 7 San Diego. Archived from the original on June 29, 2021. Retrieved June 29, 2021.
  30. ^ Frausto, Elizabeth (February 11, 2021). "MTS workshop details bus route changes coming with new trolley extension". La Jolla Light. Archived from the original on February 15, 2021. Retrieved February 15, 2021.
  31. ^ a b "Copper Line - East County Connector | San Diego Metropolitan Transit System". www.sdmts.com. April 29, 2024. Retrieved May 23, 2024.
  32. ^ "San Diego MTS looking at adding new 'Copper Line' to Trolley system". FOX 5 San Diego & KUSI News. May 8, 2024. Retrieved May 23, 2024.
  33. ^ a b Vigil, Jennifer (September 29, 2024). "MTS Copper Line Trolley Service Begins Sunday Between El Cajon, Santee". Times of San Diego. Retrieved September 29, 2024.
  34. ^ "Vintage Trolley". San Diego Metropolitan Transit System. 2015. Archived from the original on March 25, 2016. Retrieved March 23, 2016.
  35. ^ "Mid-Coast Corridor Transit Project" (PDF). San Diego Association of Governments (SANDAG). April 2015. Archived (PDF) from the original on November 29, 2021. Retrieved November 29, 2021 – via U.S. Department of Transportation.
  36. ^ "Trolley". San Diego Metropolitan Transit System (MTS). May 22, 2015. Archived from the original on April 15, 2021. Retrieved April 6, 2021.
  37. ^ "Transit Station Parking". San Diego Metropolitan Transit System (MTS). July 27, 2015. Archived from the original on April 10, 2021. Retrieved April 6, 2021.
  38. ^ a b "Trolley Timetable" (PDF). San Diego Metropolitan Transit System. September 29, 2024. Retrieved October 1, 2024.
  39. ^ "Fares & Passes". San Diego Metropolitan Transit System. September 1, 2019. Archived from the original on September 3, 2017. Retrieved April 6, 2021.
  40. ^ "Ridership Record Archives". American Public Transportation Association (APTA). Archived from the original on March 3, 2016. Retrieved December 18, 2014. Click on a link to get the Ridership Report for each Quarter from Q1 1996 onwards.
  41. ^ a b c d "Transit Ridership Report Fourth Quarter and End-of-Year 2014" (PDF). American Public Transportation Association (APTA). March 3, 2015. Archived (PDF) from the original on January 6, 2017. Retrieved March 14, 2015 – via apta.com/resources/statistics/Pages/RidershipArchives.aspx.
  42. ^ a b "MTS Announces a Record 95 Million Passengers Rode the Bus and Trolley in FY 2014". San Diego Metropolitan Transit System. August 19, 2014. Archived from the original on December 22, 2015. Retrieved September 19, 2014 – via sdmts.com/inside-mts-media-center/news-releases.
  43. ^ "APTA – Ridership Report Archives". American Public Transportation Association's (APTA). 2015. Archived from the original on March 3, 2016. Retrieved April 3, 2015.
  44. ^ a b "APTA – 2007 Q4 Ridership Report" (PDF). American Public Transportation Association's (APTA). 2013. Archived (PDF) from the original on July 18, 2013. Retrieved June 28, 2013.
  45. ^ "2017 APTA Fact Book" (PDF). Archived (PDF) from the original on October 12, 2019. Retrieved December 21, 2019.
  46. ^ a b "2019 APTA Fact Book" (PDF). Archived (PDF) from the original on March 10, 2020. Retrieved December 21, 2019.
  47. ^ "Transit Ridership Report Fourth Quarter 2018" (PDF). American Public Transportation Association. April 12, 2019. Archived (PDF) from the original on May 8, 2019. Retrieved April 29, 2021 – via apta.com/research-technical-resources/transit-statistics/ridership-report/ridership-report-archives/.
  48. ^ "Transit Ridership Report Fourth Quarter 2019" (PDF). American Public Transportation Association. February 27, 2020. Archived (PDF) from the original on January 12, 2022. Retrieved April 4, 2020 – via apta.com/research-technical-resources/transit-statistics/ridership-report/ridership-report-archives/.
  49. ^ "Transit Ridership Report Fourth Quarter 2020" (PDF). American Public Transportation Association. March 4, 2021. Archived (PDF) from the original on March 16, 2021. Retrieved March 16, 2020.
  50. ^ "Public Transit Ridership Report Fourth Quarter 2021" (PDF). American Public Transportation Association. March 10, 2022. Archived (PDF) from the original on April 1, 2022. Retrieved April 1, 2022.
  51. ^ "APTA – 2007 Q3 Ridership Report" (PDF). American Public Transportation Association's (APTA). 2013. Archived (PDF) from the original on July 18, 2013. Retrieved June 28, 2013.
  52. ^ "MTS City/Park Streetcar Feasibility Study". San Diego Metropolitan Transit System. October 9, 2012. Archived from the original on December 22, 2015. Retrieved December 27, 2015.
  53. ^ "MTS Streetcar Proposed Alignment Map". San Diego Metropolitan Transit System. Archived from the original (gif) on May 11, 2015. Retrieved July 15, 2013.
  54. ^ "Steering Committee Presentation & Discussion" (PDF). San Diego Metropolitan Transit System. April 5, 2011. p. 3. Archived (PDF) from the original on December 22, 2015. Retrieved July 6, 2011 – via sdmts.com/inside-mts-current-projects/streetcar-feasibility-study.
  55. ^ "Steering Committee Presentation & Discussion No. 3 Presentation" (PDF). San Diego Metropolitan Transit System. Archived (PDF) from the original on December 22, 2015. Retrieved December 17, 2011 – via sdmts.com/inside-mts-current-projects/streetcar-feasibility-study.
  56. ^ "STEERING COMMITTEE MEETING No. 2 PRESENTATION" (PDF). San Diego Metropolitan Transit System. Archived from the original (PDF) on October 2, 2011. Retrieved July 6, 2011 – via sdmts.com/inside-mts-current-projects/streetcar-feasibility-study.
  57. ^ "Airport Trolley". San Diego Metropolitan Transit System. September 27, 2020. Archived from the original on September 27, 2020. Retrieved April 7, 2021.
  58. ^ "Elevate 2020 SD Draft Scenarios" (PDF). San Diego Metropolitan Transit System. December 12, 2019. Archived (PDF) from the original on August 1, 2021. Retrieved April 7, 2021.
  59. ^ a b Keatts, Andrew (April 16, 2020). "It's Official: MTS Won't Pursue Transit Tax in 2020". Voice of San Diego. Archived from the original on March 10, 2021. Retrieved April 6, 2021.
  60. ^ "SANDAG seeks public comment on central mobility hub project by May 28". KUSI-TV. April 22, 2021. Archived from the original on April 22, 2021. Retrieved April 23, 2021.
  61. ^ "Central Mobility Hub". SANDAG. Archived from the original on April 22, 2021. Retrieved April 23, 2021.
  62. ^ "Public Transportation – Trolley Service". San Diego International Airport. Archived from the original on March 2, 2020. Retrieved August 12, 2021.
  63. ^ "SANDAG - Airport Transit Connection". www.sandag.org. San Diego Association of Governments. Retrieved October 2, 2024.
  64. ^ Weisberg, Lori (July 31, 2023). "Aerial people mover to San Diego airport would cut traffic on streets by 20%, new study says". The San Diego Union-Tribune. Archived from the original on October 2, 2024. Retrieved October 2, 2024.
  65. ^ Chang, Roma (August 6, 2023). "Billion-Dollar Automated Monorail Set to Vanquish San Diego Airport Gridlock, Says New Study". Hoodline. Retrieved October 2, 2024.
  66. ^ "Airport Transit Connection Concept Evaluation Study" (PDF). San Diego Association of Governments. p. 15: Figure 1-1. Conceptual ATC Alignments and Stations. Retrieved December 26, 2024.
  67. ^ "2050 Regional Transportation Plan – Chapter 6 – Systems Development: Offering More Travel Choices" (PDF). SANDAG. October 28, 2011. pp. 6–15–6–18 & 6–33. Archived (PDF) from the original on September 24, 2015. Retrieved August 1, 2013.
  68. ^ Ojeda, Artie (October 28, 2011). "SANDAG Approves Transportation Plan". NBC San Diego (KNSD). Archived from the original on October 30, 2011. Retrieved October 30, 2011.
  69. ^ "PROJECTS :: San Diego's Regional Planning Agency". SANDAG. October 28, 2011. Archived from the original on July 31, 2013. Retrieved August 1, 2013.
  70. ^ "The Red Flags in the Purple Line Plans". January 30, 2019. Archived from the original on December 16, 2022. Retrieved December 16, 2022.
  71. ^ "First Reading: Regional Transportation Commission Ordinance No. RTC-CO-2017-01" (PDF). San Diego Association of Governments. June 24, 2016. Archived (PDF) from the original on April 22, 2021. Retrieved April 14, 2021.
  72. ^ "SANDAG - Innovative Connector Concepts". www.sandag.org. Retrieved May 20, 2024.
  73. ^ "Three transportation projects, including a trolley extension into Tijuana, pitched to public Sunday". The San Diego Union-Tribune. October 10, 2022. Retrieved May 20, 2024.
  74. ^ Dibble, Sandra (July 26, 2022). "Could an Elevated Trolley be the Answer to Long Border Wait Times?". Voice of San Diego. Retrieved May 20, 2024.
  75. ^ "Trolley to Tijuana: Extending San Diego's Blue Line | SPUR". www.spur.org. November 7, 2023.
  76. ^ Berjan, Sarah (August 3, 2022). "SANDAG supports proposal that extends San Diego's Blue Line Trolley into Tijuana". Chula Vista Today. Retrieved May 20, 2024.
  77. ^ Saldaña, Jorge (May 8, 2020). "Officials Propose Cross-Border Trolley". MEXICONOW. Retrieved May 20, 2024.
  78. ^ "Goodbye to traffic and hours in line! Tijuana-San Diego trolley should be ready in 8 years". SanDiegoRed. December 15, 2023. Retrieved May 20, 2024.
  79. ^ "MTS "Owl" (Overnight) Service from San Ysidro to Downtown | San Diego Metropolitan Transit System". www.sdmts.com. April 5, 2024.
  80. ^ "2021 Regional Plan - Appendix A: Transportation Projects, Programs, and Phasing" (PDF). San Diego Association of Governments. 2021. p. 17 (A-13). Retrieved October 2, 2024.
  81. ^ "2021 Regional Plan - Appendix A: Transportation Projects, Programs, and Phasing" (PDF). San Diego Association of Governments. 2021. p. 18 (A-14). Retrieved October 2, 2024.
  82. ^ "APPENDIX B: STATE OF THE CORRIDOR - Kumeyaay Corridor" (PDF). San Diego Association of Governments. p. 45: Figure 3-12: Planned Public Transportation Routes (Adopted 2021 Regional Plan). Retrieved November 29, 2024.
  83. ^ "APPENDIX B: STATE OF THE CORRIDOR - Kumeyaay Corridor" (PDF). San Diego Association of Governments. p. 45: Figure 3-12: Planned Public Transportation Routes (Adopted 2021 Regional Plan). Retrieved November 29, 2024.
  84. ^ "Attachment A Recommended Transportation Solution Set" (PDF). p. 5.
  85. ^ "Route 583 - CMH to U.S. Border Commuter Rail" (PDF). Retrieved November 29, 2024.
  86. ^ "San Diego U2 Trolleys successfully operate in Argentina". San Diego Metropolitan Transit System. March 9, 2010. Archived from the original on December 22, 2015. Retrieved December 11, 2015 – via sdmts.com/inside-mts-media-center/news-releases.
  87. ^ Bowen, Douglas John (January 30, 2015). "MTS adds S70 LRVs to San Diego Blue Line". Railway Age. Archived from the original on February 18, 2015. Retrieved February 17, 2015.
  88. ^ "First Ever Trolley Goes Back into Service". San Diego Metropolitan Transit System (Press release). July 12, 2019. Archived from the original on February 27, 2024. Retrieved April 14, 2021.
  89. ^ "Other Electric Railways Roster". Southern California Railway Museum. Archived from the original on April 15, 2021. Retrieved April 14, 2021.
  90. ^ "Light Rail Cars Roster Collection". Western Railway Museum. Archived from the original on April 16, 2021. Retrieved April 14, 2021.
  91. ^ "San Diego Trolley #1019". Rockhill Trolley Museum. June 29, 2014. Archived from the original on April 15, 2021. Retrieved April 14, 2021.
  92. ^ "Worldwide Review [regular news section]". Tramways & Urban Transit. UK: Light Rail Transit Association/Mainspring Ltd. September 2021. pp. 389–390. ISSN 1460-8324.
  93. ^ "Memphis' famous trolley cars will soon look very different". March 27, 2022. Archived from the original on February 27, 2024. Retrieved March 29, 2022.
  94. ^ Burroughs, David (April 19, 2019). "San Diego unveils new-generation Siemens LRVs". International Railway Journal. ISSN 0744-5326. Archived from the original on April 11, 2021. Retrieved November 13, 2020.
  95. ^ Emerson Smith, Joshua (April 17, 2019). "MTS rolls out newly designed trolley cars this weekend". The San Diego Union-Tribune. Archived from the original on April 12, 2021. Retrieved April 12, 2021.
  96. ^ "San Diego selects Siemens S700 light rail vehicles". Railway Gazette International. August 1, 2019. Archived from the original on April 12, 2021. Retrieved April 12, 2021.
  97. ^ "PCC Light Rail Vehicle" (PDF). San Diego Metropolitan Transit System. February 2013. Archived (PDF) from the original on December 22, 2015. Retrieved December 11, 2014 – via sdmts.com/about-mts.
  98. ^ "Restored Trolley from 1946 Makes Public Debut on Silver Line". San Diego Metropolitan Transit System. March 2, 2015. Archived from the original on December 22, 2015. Retrieved April 17, 2016.
  99. ^ Copeland, P. Allen. "San Diego and the PCC Streetcar" (PDF). Archived (PDF) from the original on August 5, 2021. Retrieved July 19, 2021.
  100. ^ a b "San Diego Trolley, Inc. Light Rail Vehicles" (PDF). San Diego Metropolitan Transit System. January 2013. Archived from the original (PDF) on July 9, 2014. Retrieved November 26, 2013.

Sources

[edit]
  • Gena Holle, The San Diego Trolley, Interurban Press (1995); "Guideway Planning Project Final Report"
  • MTDB (1978); "Report on Feasibility of Using Existing SD&AE ROW for Commuter Service"
  • San Diego County (1978); MTDB publicity materials including "San Diego Trolley, Inc. Summary" (1997), MTDB Progress Report 1976–1986; Pacific Southwest Railway Museum, San Diego & Arizona Railway.
[edit]
KML is from Wikidata